Storm line answered day and night · tarps on the roof the same day Call 555-0148
Sht. A-01Trade Roofing / HVACCrew In-house

Roofs thathold.Air thatworks.

One crew for the two things that keep weather out of your house. A written inspection, a fixed price, and the job finished the way it was drawn.

  • Licensed & insured
  • Fixed written quotes
  • Nail-sweep every job
126 01 RIDGE VENT 02 ARCH. SHINGLE 03 SYNTH. FELT 04 ICE + WATER 05 1/2" DECKING 06 TRUSS @ 24"
Fig. 1 · Roof assembly, explodedNot to scale
02 / Services

Two trades.
One schedule.

Roof and heating problems usually show up in the same week. We send one crew, write one report, and give you one price.

01Most booked

Roof replacement

Tear-off to the deck, new underlayment, architectural shingles or standing-seam metal. Finished in one to two days for most homes.

  • Deck inspection
  • Ice & water shield
  • Ridge venting
02Same day

Leak & storm repair

We trace the water back to where it gets in, which is rarely where it drips. Emergency tarping when the weather won't wait.

  • Leak tracing
  • Tarping
  • Insurance photos
03Seasonal

Gutters & flashing

Seamless gutters cut on site, re-pitched to drain, and flashing that is bent and sealed instead of caulked over.

  • Seamless runs
  • Guards
  • Chimney flashing
04Efficient

Heat pumps

Sized from a room-by-room load calculation, not the label on the old unit. Cold-climate models that heat well below freezing.

  • Load calculation
  • Ducted & mini-split
  • Rebate paperwork
05Winter

Furnace & boiler

Repairs on most makes, safety checks on every visit, and a straight answer about whether to repair or replace.

  • CO testing
  • Tune-ups
  • Replacements
06Summer

Central air

New installs, coil cleaning, refrigerant leak repair and the duct sealing that makes the upstairs bedroom finally cool down.

  • Duct sealing
  • Smart thermostats
  • Coil service
03 / The roof report

You see what
we saw.

Every inspection ends with a plan of your roof, each problem pinned where it is, and a plain answer on what needs doing now and what can wait.

Job R-2417 · Roof planInspected Tue 09:40
1 2 3 4 N 10 FT CHIMNEY SOUTH SLOPE 6/12
Findings4 items
  • 1

    Lifted shingles, south slope

    Wind has broken the seal on two courses. Water will get under them in the next driving rain.

    Repair now
  • 2

    Cracked boot on plumbing vent

    The rubber collar has split. This is the drip over the upstairs bath.

    Repair now
  • 3

    Granule loss at the valley

    Normal wear for its age. Worth a look again next spring.

    Monitor
  • 4

    Gutter pitch, garage run

    Draining properly toward the downspout.

    Good
Fixed price for items 1 and 2, agreed before we start.Approve repairs
04 / Heating & cooling

Sized for
your house.

Most comfort problems are sizing problems. We measure before we quote, so the system that goes in is the one your rooms actually need.

  • MeasureRoom-by-room load calculation, window and insulation check
  • InstallHeat pumps, furnaces, boilers, central air and mini-splits
  • ServiceRepairs on most makes, with parts on the truck
  • AirFiltration, humidity control and duct sealing

Comfort plan

A spring and fall visit, priority booking, no after-hours surcharge.

Join the plan
05 / How we work

Four steps.
No surprises.

The same order on every job, from a single shingle to a full system swap.

  1. 01

    Call or book online

    A person answers, day or night. Tell us what you are seeing and we will tell you how soon we can be there.

    Today
  2. 02

    Inspection

    On the roof or at the unit, with the report on your phone before we leave the driveway.

    Within 48 hours
  3. 03

    Fixed quote

    One written price with the materials named. If we find more once we open it up, you decide before we do anything.

    Same visit
  4. 04

    Install & clean-up

    Our own crew, a magnet sweep for nails, and a walk-through when we are done.

    On the date we set
06 / Craft

The parts you
never see.

A roof fails at its edges and seams. These are the details we will not skip, and the ones we show you in the report.

FASCIA DRIP EDGE SHINGLE
Detail A · Eave

Drip edge, every eave

Metal bent under the first course so water drops clear of the fascia instead of rotting it.

STEP FLASHING SIDING
Detail B · Wall

Step flashing, piece by piece

One bent piece per shingle course where the roof meets a wall. No tubes of sealant standing in for metal.

RIDGE VENT INTAKE AT SOFFITEXHAUST AT RIDGE
Detail C · Ridge

Air in low, out high

Balanced soffit and ridge venting keeps the attic dry in winter and stops summer heat cooking your shingles.

Ten years on our
workmanship.
In writing.

If something we installed fails because of how we installed it, we come back and fix it. That promise is on the contract you sign.

07 / Book

Book an
inspection.

Pick what needs looking at and a window that suits you. We confirm by text, and the visit is free.

555-0148Answered day and night
What needs looking at?Step 1/2
Roof
Heating
Cooling
Not sure
Pick a windowStep 2/2
Mon8 – 10 am
Tue10 am – 12
Tue2 – 4 pm
Wed8 – 10 am
Thu12 – 2 pm
Sat9 – 11 am
Hold Tuesday 10 amNo card needed. Reschedule by replying to the text.